b. Enter the
key-manager key show -detail
command to see a detailed view of all keys stored in
the onboard key manager and verify that the
Restored
column =
yes
for all authentication keys.
If the
Restored
column = anything other than
yes
, contact Customer Support.
c. Wait 10 minutes for the key to synchronize across the cluster.
14. If you are running ONTAP 9.6 or later, run the security key-manager onboard sync:
a. Run the
security key-manager onboard sync
command and then enter the passphrase when
prompted.
b. Enter the
security key-manager key query
command to see a detailed view of all keys stored
in the onboard key manager and verify that the
Restored
column =
yes/true
for all authentication
keys.
If the
Restored
column = anything other than
yes/true
, contact Customer Support.
c. Wait 10 minutes for the key to synchronize across the cluster.
15. Move the console cable to the partner node.
16. Give back the target node using the
storage failover giveback -fromnode local
command.
17. Check the giveback status, 3 minutes after it reports complete, using the
storage failover show
command.
If giveback is not complete after 20 minutes, contact Customer Support.
18. At the clustershell prompt, enter the
net int show -is-home false
command to list the logical
interfaces that are not on their home node and port.
If any interfaces are listed as
false
, revert those interfaces back to their home port using the
net int
revert
command.
19. Move the console cable to the target node and run the
version -v
command to check the ONTAP
versions.
20. Restore automatic giveback if you disabled it by using the
storage failover modify -node local
-auto-giveback true
command.
Option 2: Restore NSE/NVE on systems running ONTAP 9.5 and earlier
Steps
1. Connect the console cable to the target node.
2. Use the
boot_ontap
command at the LOADER prompt to boot the node.
3. Check the console output:
If the console
displays…
Then…
The login prompt
Go to Step 7.
18
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...