NetApp AltaVault Cloud Integrated Storage Installation and Service Guide for Physical Appliances
65
Beta Draft
Replacing a controller chassis
System maintenance
5.
Identify components as described in this table:
6.
Reconnect the power cables to the power supplies and secure them using the cable retaining clips.
7.
Reconnect the power cables to the power source.
Note:
Power on the disk shelf attached to the AltaVault system and set the disk shelf ID before powering on the controller. For
information on setting the disk shelf ID, see
“Connecting the power and starting the system” on page 29
8.
Turn the on/off switch on the power source and the power supply to the ON (|) position to start the boot process
for the system.
9.
If all the FRU replacements were successful, the system should boot normally.
To ensure that the system has booted correctly, verify that the System attention LED on the chassis front and
Controller attention LED on chassis rear are not lit after the system has finished booting.
Verify the health of your system and the system configuration using the command,
show info
.
Regarding the boot device:
If the boot device is replaced, you must contact technical support to assist in the initialization of the device.
If the boot device is damaged or corrupted during the replacement process, contact technical support for help
in restoring the system to a healthy state.
Replacing a controller chassis
The chassis is the external metal casing that houses the controller module, power supplies and fan modules. The chassis
has mounting flanges that are used to install the chassis in a rack or cabinet. The chassis is not a hot-swappable field-
replaceable unit (FRU); you must shut down your system before replacing the chassis.
To replace a chassis for an AltaVault system, you must remove the power supplies, fan modules, and controller module
from the old chassis, remove the old chassis from the rack or cabinet, install the new chassis, and then reinstall the
components in the new chassis.
Before you begin
You must perform a clean system shutdown to ensure that all data has been written to the storage subsystems.
Use the
reload halt
command to shut down the system.
If you cannot gracefully shut down the system, contact technical support for assistance.
Power off the system and disconnect power from it. For detailed instructions on powering off the system and
disconnecting the power as described in
“Shutting down controllers” on page 60
To remove a chassis
1.
If
you
are not properly grounded, properly
ground yourself
.
Component
Description
1
Thumbscrew
2
Cam handle
Summary of Contents for AltaVault Cloud Integrated Storage 4.1
Page 2: ......