Steps
1. Install the rail kits, as needed.
2. Install and secure your system using the instructions included with the rail kit.
You need to be aware of the safety concerns associated with the weight of the system.
The label on the left indicates an empty chassis, while the label on the right indicates a fully-
populated system.
1. Attach cable management devices (as shown).
2. Place the bezel on the front of the system.
Step 3: Cable controllers to your network
You can cable the controllers to your network by using the two-node switchless cluster
method or by using the cluster interconnect network.
Option 1: Two-node switchless cluster
Management network, data network, and management ports on the controllers are
connected to switches. The cluster interconnect ports are cabled on both controllers.
You must have contacted your network administrator for information about connecting the system to the
switches.
Be sure to check the direction of the cable pull-tabs when inserting the cables in the ports. Cable pull-tabs are
up for all networking module ports.
557