Rail Kit Assembly
172
7.1. Unpacking the System
Unpack your system and identify each item.
Whenever you need to lift the system, get others to assist you. To avoid injury, do not
attempt to lift the system by yourself.
The system is not fixed to the rack or mounted on the rails. To avoid personal injury
or damage to the system, you must adequately support the system during installation
and removal.
To avoid a potential electrical shock hazard, a third wire safety grounding conductor is
necessary for the rack installation. The rack equipment must provide sufficient airflow
to the system to maintain proper cooling.
WHEN INSTALLING RAILS IN A SQUARE-HOLE RACK IT IS IMPORTANT TO
ENSURE THAT THE SQUARE PEG SLIDES THROUGH THE SQUARE HOLES.
SQUARE STUDS MUST BE FLUSH WITH THE RACK POSTS TO INSTALL PROP-
ERLY.
Summary of Contents for Demos R420 M2
Page 1: ...Netberg Demos R420 M2 server User manual...
Page 2: ...Netberg Demos R420 M2 server User manual...
Page 12: ...1 Chapter 1 Safety Information...
Page 19: ...8 Chapter 2 About the Server...
Page 32: ...21 Chapter 3 Installing Hardware...
Page 93: ...82 Chapter 4 Connectors...
Page 95: ...Connectors 84 Figure 4 1 Mainboard Overview...
Page 108: ...Connectors 97 4 9 Sensor Board Connectors Figure 4 13 Sensor Board 1 I2C Connector...
Page 109: ...98 Chapter 5 Cable Routing...
Page 110: ...Cable Routing 99 5 1 Cable Routing for 12 x 3 5 Hard Drives Configuration...
Page 111: ...Cable Routing 100 5 2 Cable Routing for 24 x 2 5 Hard Drives Configuration...
Page 112: ...101 Chapter 6 BIOS...
Page 125: ...BIOS 114 6 3 1 5 CPU Advanced PM Tuning...
Page 172: ...BIOS 161 6 4 2 View FRU Information...
Page 176: ...BIOS 165 Menu Fields Settings Comments Network Device BBS Priorities 1...
Page 182: ...171 Chapter 7 Rail Kit Assembly...
Page 186: ...Rail Kit Assembly 175 Figure 7 3 Tightening the Thumbscrews...
Page 187: ...176 Chapter 8 Troubleshooting...