Hardware Installation
9
ProSafe™ 24-Port Managed Switch JGSM7224
1.
When unpacking a static-sensitive component from its shipping carton, leave it in the
antistatic package until you are ready to install it. Just before unwrapping the antistatic
package, discharge static electricity from your body.
2.
Before moving a sensitive component, place it in an antistatic container or package.
3.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads,
workbench pads, and an antistatic grounding strap.
Unpacking the Hardware
Check the contents of the boxes to make sure that all items are present before beginning the
installation.
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes.
Carefully remove the hardware, and place it on a secure and clean surface. See
Selecting a Location
on page
10.
3.
Remove all packing material.
4.
Make sure that all items are present. See
Package Contents
on page
8.
Note:
If any item is found missing or damaged, contact your local
NETGEAR reseller for replacement.
5.
Inspect the products and accessories for damage. Report any damage immediately.
Installation
Install the equipment in the following sequence, as presented in this chapter:
1.
Select a location. See the following section,
Selecting a Location
.”
2.
Install the switch. See
Installing the Switch
on page
10.
3.
Check the installation. See
Checking the Installation
on page
11.
4.
Apply power and check the LEDs. See
Connecting to Power and Check the LEDs
on
page
12.