Installation
Getting Started – New NetPilot Range
19
Powering on
You can now power-on the NetPilot. Remember that the power-on
sequence can take up to three minutes. It is completed when a final
audible bleep is given.
Powering off
As with any computer that includes a disk, when the NetPilot is shut
down it is desirable that the software is able to close any open files on
the disk correctly, before the power is removed. To achieve this, go to
the Power > Shutdown screen on the MMI and perform a shutdown or
depress the power switch on the rear or the front of the machine to the
off position. You must wait for the final audible beep noise and all LED
activity to finish prior to removing the power cable. This should take
around two minutes to complete.