Installation
14
Check that the following steps have been carried out:
Compliance with permissible ambient temperatures ensured?
NTP mounted on even surface (±0,1 mm flatness)?
Securing of fastening screws (NBS) checked?
Screw size and tightening torques observed?
Maintenance unit (filter, regulator, mist lubricator; NTP L: filter,
regulator), valve and supply line mounted?
Compressed air supply line securely fastened?
Specifications on kind of hose, hose length and nominal width
observed?
Silencer mounted?
NTP secured against falling by means of a safety cable in criti-
cal assembly situations?
Checklist
installation
Summary of Contents for NTP 18
Page 21: ...Annex 21 12 Annex ...