Page 103/ 191
D)
After attaching the RJ-45 connector to the network cable, plug the connector in the network
plug on the blue CPU housing as below.
E)
Once the storage medium and the deckmount are placed upon each other, attach the
vulcanized tape around the flanges to ensure water tightness.
Stretch around 50cm of vulcanized tape and make sure to wrap it twice around the seam that is
between the capsule and the deckmount.
F)
Place the locking mechanism.
Summary of Contents for NW6000
Page 1: ......
Page 91: ...Page 91 191...
Page 92: ...Page 92 191...
Page 120: ...Page 120 191 Figure 17 4 2 Connection figure Digital Module 16 channels...
Page 121: ...Page 121 191 Figure 17 4 3 Connection figure Digital Module 24 channels...
Page 125: ...Page 125 191 Figure 18 4 2 Connection figure Analogue Module 8 channels...
Page 126: ...Page 126 191 Figure 18 4 3 Connection figure Analogue Module 12 channels...
Page 184: ...Page 184 191 Figure 5 8 1 Sample dataset playback...