Page 144/ 191
The video source information will be coloured in red when there is no recorded image or when the
time between the connected computer and VDR is not synchronized.
22.4 Annual Performance Test
Netwave Systems recommends performing an Annual Performance Test (APT) every 12 months
referring to MSC.1/Circ.1222.
The VDR page retrieves information from the VDR, that is required for the APT, and will be filled
in automatically in the APT page. Additional information needs to be filled in by the APT performing
certified engineer. Click on the button “Create APT report” to generate the APT in a pdf format.
The pdf file will be stored on the VDR and needs to be send to
certified engineer when performing the APT.
22.5 Configurator
The VDR configurator webpage contains VDR settings that can not be set by the Playback
software. The configurator page also includes tools for configuration and troubleshooting. The
following paragraphs describes each of the settings and tools.
Summary of Contents for NW6000
Page 1: ......
Page 91: ...Page 91 191...
Page 92: ...Page 92 191...
Page 120: ...Page 120 191 Figure 17 4 2 Connection figure Digital Module 16 channels...
Page 121: ...Page 121 191 Figure 17 4 3 Connection figure Digital Module 24 channels...
Page 125: ...Page 125 191 Figure 18 4 2 Connection figure Analogue Module 8 channels...
Page 126: ...Page 126 191 Figure 18 4 3 Connection figure Analogue Module 12 channels...
Page 184: ...Page 184 191 Figure 5 8 1 Sample dataset playback...