SmartNA-X
™
1G/10G User Guide 1.4
©
2015 Network Critical Solutions Limited
Chapter
2
Getting Started
List of supplied components
The following components have been supplied with your SmartNA-X system.
• SmartNA-X 1U chassis.
• SmartNA-X TAP modules (models as per your order). Red modules are maximum 10 gigabit/second (10G bps), blue
modules are maximum 1 gigabit/second (1G bps).
• 10G optical cables.
• Serial management cable – DE-9 female to 8P8C (1.5 meters).
• SmartNA-X chassis rack ears (brackets and screws).
• 2 x power leads.
• Blanking plates to cover empty slots when running.
Please contact Network Critical Support (support@networkcritical.com) if any item is missing from the package.
Installing the chassis
To prevent unregulated access, the SmartNA-X chassis should be installed in a secure server rack with access to
authorized personnel only.
Caution:
Static electricity can damage sensitive electronic components. To discharge static, fit an antistatic wrist-
strap or touch a bare metal surface before handling SmartNA-X components.
1.
Unpack all parts onto a clean workbench for inspection.
2.
Carefully check all parts against your order. If any parts are missing or have become damaged during shipping, please
report it immediately to Network Critical. See
on page 200 for contact information.
3.
Attach the rack ears to the sides of the chassis using the supplied screws.
Figure 11: Attach the rack ears to the SmartNA-X chassis
4.
Install the chassis in a 19" server rack. The chassis occupies one rack unit. Be sure to leave enough room for all the
cable connections (front and back), and for proper airflow and ventilation around the chassis.