27
1. Place clamp on platform, secure in place with correct type of screws: #S2116-3051,
10-24 x 5/16-inch flat Phillips head, provided with the clamps (
see Figure 6a
).
2. Place the loose girdle around the upper portion of clamp body so that it is held in
place by the legs of the clamp.
3. Insert the flask into the clamp, and push the girdle down so the rubber tubes are in
contact with the platform and the flask.
Figure 6: Double Girdle Clamp Installation
UPPER GIRDLE
WITH GIRDLE
TUBES
LOWER
GIRDLE WITH
GIRDLE TUBES
PLATFORM
CLAMP
MOUNTING HOLES (5)
CLAMP BODY
(LEGS AND BASE)
Figure 6a: Clamp Fastener
6.4
Electrical Connections
Before making electrical connections, verify that the power source voltage matches the
voltage on the electrical specification plate and that the
ON/OFF
switch is in the
OFF
position. The electrical specification plate is located on the rear panel of the unit near the
power connector.
Connect the power cord to the power connector, then connect the other end to a suitable,
grounded receptacle. Make sure there is enough clearance to disconnect the plug
whenever necessary.
New Brunswick Scientific Co., Inc.
User’s Guide
Summary of Contents for Innova 43
Page 2: ...2 Innova 43 43R Incubator Shakers M1320 0050 User s Guide ...
Page 10: ...10 Innova 43 43R Incubator Shakers M1320 0050 User s Guide ...
Page 79: ...79 11 1 1 CE Declaration of Conformity New Brunswick Scientific Co Inc User s Guide ...
Page 92: ...92 Filling the 33 Wavy Arrows Icon 21 Innova 43 43R Incubator Shakers M1320 0050 User s Guide ...