background image

Check Box for These Contents 

In the event of missing or defective parts please call our customer service department at 

1 800 282 9346

(Mon. to Fri. 8:00 AM to 4:00 PM EST)

.

1.

Keystone

 (1)

 

10047

2.

Arches 

(2)

 

10046

3.

Spindles - Short 

(2) 

10040

4.

Spindles - Long 

(2)

 

10041

5.

Top Rail 

(1)

 

10580-1

6.

Posts 

(2)

 - 

10583-1

7.

Middle Rails 

(3)

 

10582-1

8.

Vertical Spindles 

(5)

 - 

10581-1

9.

Bottom Rail 

(1)

 

10584-1

10.

1 1/2” 

(38 mm) 

Self-Auguring Stainless Steel Screw 

(8)

 - 

20016

 

Tools You Will Need

• Cordless Drill
• Tape Measure
• Level
• Shovel

General Information

Read Instructions through carefully before beginning assembly.

• When assembling components, place on a non-abrasive surface

(i.e. shipping box) 

to avoid scratching. 

• We recommend an area approx 5’x 8’ 

(1.5 m x 2.4 m) 

for unobstructed assembling.

• You should not need to use excessive force when assembling component.

Hanover Trellis

Please read through before starting assembly.

ASSEMBLY INSTRUCTIONS

1

10

Not to Scale

IMPORTANT:  CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.

V2.

2

/

080117

Ground

5

1

4

2

6

www.newenglandarbors.com

7

3

9

8

77.375 in

197 cm

30 in

76 cm

37 in

94 cm

3.5 in

9 cm

Summary of Contents for Hanover Trellis VA54230

Page 1: ...ll Need Cordless Drill Tape Measure Level Shovel General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 5 x 8 1 5mx2 4m for unobstructed assembling You should not need to use excessive force when assembling component Hanover Trellis Please read thro...

Page 2: ...tructions Lay out the bottom rail Insert the vertical spindles into the precut holes until they bottom out Slide the three middle rails onto the vertical spindles Space the rails approximately 9 23 cm apart Finish the ladder by placing the top rail onto the vertical spindles The top rail has holes on both sides but the spindles will not go through it 1 STEP TWO Assemble the Trellis Bottom Rail Hol...

Page 3: ...hole in the top rail as shown Push the opposite end onto the nearest arch socket Slip one of the long spindles into the next hole in the top rail as shown Again push the opposite end onto the next arch socket Repeat steps 5 and 6 for the other two spindles Note Pay close attention to the angled ends of each spoke to ensure a proper fit Hold one end of the arch down into the post and secure in plac...

Page 4: ...osts holes approximately 12 30 cm deep x 5 13 cm diameter Insert pressure treated wood into the trellis post Set the trellis into position and use a level to check the posts Once you are satisfied with the orientation backfill the holes Optional for a sturdier installation pour concrete into the excavated holes to hold the posts in place www newenglandarbors com C A 3 5 13 cm B 12 30 cm Level 24 6...

Reviews: