2
Take the arches and snap them onto either side of the
keystone.
Using four screws
,
fasten the arches to the keystone on
b
oth
sides as illustrated.
Note: All screws are self-tapping and require no pre-drilling.
Set aside the assem
b
led arch.
1
2
STEP ONE
Assemble the Top Arch
Hanover Trellis Instructions
Lay out the
b
ottom rail. Insert the vertical spindles into the
precut holes until they
“b
ottom out”.
Slide the three middle rails onto the vertical spindles.
Space the rails appro
xi
mately 9”
(23 cm)
apart.
Finish the “ladder”
b
y placing the top rail onto the vertical
spindles.
The top rail has holes on
b
oth sides
, but the spind
les will
not go through it.
1
STEP T WO
Assemble the Trellis
Bottom Rail
(Holes only on top of rail)
1
1
2
3
Middle Rails
(Identical holes on top and bottom of rails)
2
3
2