SECTION 3 -- FIELD OPERATION
3--24
THREE--SPEED, SHIFTABLE P.T.O.
(where fitted)
A 6--spline P.T.O. output shaft of 1.375 in. (34.9 mm)
diameter is supplied, designed to operate at 540
rev/min.
Dependent upon tractor specification, an alternative
21--spline shaft of 1.375 in. (34.9 mm) diameter,
designed to operate at 1000 rev/min., may also be
supplied with the tractor or is available from your
dealer.
Operating
Before engaging the P.T.O., select a P.T.O. ratio, as
follows:
IMPORTANT:
If your tractor has the optional ground
drive P.T.O., an additional lever (2) is provided. To
prevent damage to the P.T.O. driveline, ensure that
this lever is moved fully to the
left
, as shown, before
operating the engine-driven P.T.O. (The forward
position is used to engage ground drive P.T.O.).
With 6--spline shaft installed
32
•
With the tractor
stationary
and the P.T.O. control
knob in the
disengaged
position, select the
required speed by means of the range lever (1).
Lift the spring-loaded collar (2) beneath the knob
and move the lever fully to the right to engage
1000 speed, to the intermediate position for 540
Economy, and fully to the left for standard 540
speed.
IMPORTANT:
The P.T.O. range lever cannot be
moved until the spring-loaded collar beneath the
knob is lifted. This feature is incorporated to prevent
inadvertent selection of the economy range which
could result in overspeeding of a P.T.O. driven
implement.
33
Operating
NOTE:
The 3-speed P.T.O. range lever has a neutral
position, denoted by the letter ‘N’. See Figure 33.
Engine and P.T.O. shaft speeds are as follows:
Range Lever
Position
Engine Speed
(rev/min)
P.T.O. Speed
(rev/min)
Fully rearward
(6--spline shaft)
1970
540
Intermediate
position
(6--spline shaft)
1546
540
Fully forward
(6
li
h ft)
1145
540
(6--spline shaft)
(light operations only)
Summary of Contents for T6010 DELTA
Page 1: ...OPERATOR S MANUAL T6010 T6020 T6030 T6050 T6070 Delta and Plus Tractors ...
Page 6: ...BLANK ...
Page 28: ...SECTION 1 GENERAL INFORMATION AND SAFETY 1 22 NOTES ...
Page 280: ...SECTION 3 FIELD OPERATION 3 146 NOTES ...
Page 366: ...SECTION 5 FAULT FINDING 5 12 NOTES ...
Page 368: ...SECTION 6 VEHICLE STORAGE 6 2 NOTES ...
Page 400: ...SECTION 8 SPECIFICATIONS 8 24 NOTES ...
Page 402: ...SECTION 9 1ST 50 HOUR SERVICE SHEETS 9 2 ...
Page 404: ...SECTION 9 1ST 50 HOUR SERVICE SHEETS 9 4 ...
Page 410: ...SECTION 10 INDEX 10 6 ...
Page 412: ...sblank ...