- 39 -
L3030G4 CNH
www.NewLeader.com
(800) 363-1771
307369-AA-G
Header
Bin 1: Main holding bin for material or Insert. Insert bins (shown on following pages as applicable) are
con
fi
gured as Bins 1 and 2 depending on type used. Availability varies per model of spreader.
Conveyor: Conveys material to rear of unit.
Conveyor Control Valve: Hydraulic valve with electronic motorized control, regulates
fl
ow to conveyor
motor. Additional control valve added for insert bin.
Cross Tubes: Support body, attach to Chassis frame. Transfer weight from Main Hopper to Chassis.
Feedgate: Adjustable gate mounted into Rear Endgate. Allows for variable rates of material
fl
ow by
adjusting jack to desired height.
Hillside Divider: Ensures balanced
fl
ow of material across conveyor when on hillsides or uneven terrain.
Inverted “V”: Mounted inside Main Hopper when Insert not installed. Distributes weight pressure
across conveyor, allowing for consistent material
fl
ow to Feedgate, and promotes an improved blend
when spreading fertilizer.
Lift Hooks: Used to lift unit or insert with appropriately rated lifting device.
Material Divider: Ensures uniform spread pattern by directing material off of conveyor onto spinner discs.
Rear Endgate: Bolt-in endgate furthest from chassis cab (Rear based on
direction of travel). Holds mounted Feedgate, allowing for rear release of material from bin.
Sight Window: Allows viewing of inside of Bin 1 from vehicle cab.
Sill: Base of Main Hopper side walls. Contains Conveyor and supports machine walls.
Spinner Assembly: Contains adjustable G4 Spreader system, consisting of hydraulic spinners used
for dispersal of various materials at different positioned settings allowing for consistent, even spread
patterns across a wide variety of material with a high rate of accuracy.
Spinner Control Valve: Hydraulic valve with PWM control, regulates
fl
ow to spinner motors.
Spinner De
fl
ectors: De
fl
ect material away from machine.
Spinner Guards: Upper and Lower guards, protects operators from spinner discs. Must be in place
during any operation.
Stake: Side support for main hopper walls.
Unload Operation Valve: Closed center ball valve equipped on MultApplier complete units. Valve is
open for normal operation, must be closed to perform calibration process.
Introduction