- 23 -
L5034G4 AGCO
www.NewLeader.com
(800) 363-1771
306375-AA-E
1. NOTICE: SPREAD PATTERN TESTING
To obtain optimal machine performance:
Spinner assembly and material flow divider have NOT been adjusted at the factory. Before
assembling unit, read and follow assembly instructions in the operation and maintenance manual
for this unit�
Before spreading material, spread pattern tests must be conducted to properly adjust the spread
pattern� Refer to the “How to Check your Spread Pattern” manual for adjustment instructions� A
spread pattern test kit is available from your New Leader dealer�
Wind, humidity, rain and other adverse weather conditions can affect spread pattern, resulting in
uneven crop growth and loss of yields�
THE MANUFACTURER OF THIS SPREADER WILL NOT BE LIABLE FOR MISAPPLIED MATERIAL
DUE TO AN IMPROPERLY ADJUSTED SPREADER OR ADVERSE WEATHER CONDITIONS�
It is recommended that spread pattern tests be conducted prior to each spreading season, after
any spreader maintenance, and periodically during the spreading season� Spread pattern tests
must be conducted whenever a new product is to be applied�
11
Informational Decals