- 60 -
Operations/Features
Create New Job
The following is a guide for running system for first time.
1� Create Job in display�
This operation will vary from display to display� Refer to display manual on how to create a job using
Task Control. When finished, activate VT.
2� Verify Product Density�
Material Density will vary from product to product� It is imperative that correct density is entered in
controller for rates to come out correctly�
• To change product density, press
�
• Use keypad to enter density� Press
to accept
change and continue, or
to cancel�
Controller Operations