1
MultiBin Lid Cylinder Check Valve Replacement Instructions
WARNING
Shut off all power and allow all moving parts to come to rest before performing any maintenance
operation.
WARNING
To perform the process described, a ladder or personal lifting device will be required. Use
extreme caution when working above ground. Use of 3-point contact when on a ladder, or use
of safety harness when using any type of lifting device is highly recommended.
WARNING
Pressurized air may cause sudden movement of parts. Do not service cover components until
safety precautions have been performed.
•
Take preventative measures to prevent falling or runaway of cylinder or mechanism before
maintenance and restart of spreader.
•
Exhaust all residual air and cut the pressure supply for components before servicing.
•
Injury can occur if precautions are not taken.
Follow this procedure to replace/re-install the MultiBin Lid cylinder check valve. See Figure 1 for list of parts in upgrade
kit.
Item
Description
Quantity
Tools Needed
1
Check Valve Assembly
1
Vise Grips
Clean Shop Rag
2
Spring
1
Flat Blade Screwdriver Small External Snap Ring Pliers
3
Speed Control Fittings
2
20” Wood block
Ratchet wrench
4
Inline filter Assembly
1
Pliers
7/16” & 9/16” Sockets
5
Clevis Spring Plates
2
Utility Knife
Wrenches:
6
Corrugated tube
1
Small Pin Punch
7/16”, 9/16” & 11/16”
7
1/4” tubing
24”
Small Hammer
Figure 1: Parts in Kit
1
4
2
3
6
5
7