MX100-TG User Manual
19
3
I
NSTALLING THE
MX100-TG
The installation of the MX100-TG gateway requires a few simple
tasks.
Site Preparation
Power Input
The MX100-TG requires 100-240 VAC, 47-63Hz. Maximum current
consumption is 1A.
Redundant Power Feeds
New Rock recommends redundant power feeds from separate
power sources or UPS power backup to ensure the continuous
operation of the gateway. This ensures proper operation of the
gateway in the event of a power loss from one of the sources.
Airflow and Thermal Cooling Requirements
The MX100-TG gateway is equipped with two fans for cooling the
system modules. The air intake is located on the right and left sides
with the exhaust vents being located on the rear of the chassis. To
prevent overheating, the air intake and exhaust must not be
obstructed. After installing the gateway avoid installing other
equipment that exhausts hot air directly into the MX100-TG air
intake.
The gateway produces heat at a maximum of 256 BTU/hr. The
facility air conditioning system must be capable of handling the heat
Summary of Contents for MX100-TG
Page 1: ...MX100 TG USER MANUAL Release 3 0 ...
Page 7: ...MX100 TG User Manual 7 Cautions show information requiring extra attention ...
Page 11: ...ABOUT THIS BOOK MX100 TG User Manual 11 Fax 86 21 61202704 ...
Page 67: ...Monitoring MX100 TG User Manual 67 Figure 21 Startup Information Log ...
Page 71: ...System Tool MX100 TG User Manual 71 Figure 25 Gateway Restart Screen ...
Page 75: ...New Rock Technologies Inc 75 ...