© New Scale Technologies, Inc. MPM System Manual, June 9, 2017
P a g e
|
11
MPM-4 DOF Arm-Upright continued… Assembly of M3-LS-3.4-15-XYZ
3.
Install cables between
M3-LS-3.4-15-XYZ-MPM-Upright
and
M3-USB-3:1-6V
Adapter. Route
and secure cables as shown below and keep flexible cable loops to allow unencumbered stage
movement.
4.
Connect the X, Y and Z-axis cables to the
M3-USB-3:1-6V
adapter as shown.
Maintain sufficient
cable loop to allow
extension of arm
without binding.
Secure cables to
pre-installed tie
downs using
provided tie
wraps.