© New Scale Technologies, Inc. MPM System Manual, June 9, 2017
P a g e
|
16
MPM-4 DOF Arm-Inverted continued… Assembly of M3-LS-3.4-15-XYZ
2.
Install cables between
M3-LS-3.4-15-XYZ-MPM-Inverted
and
M3-USB-3:1-6V
adapter. Route
and secure cables as shown below and keep flexible cable loops to allow unencumbered stage
movement.
Secure cables to pre-installed
tie downs using provided tie
wraps.
Maintain sufficient cable length to
allow extension of arm without
binding.