A
B
2.0
Floor Installation
A
Using a rubber mallet and screwdriver, knock out the
tabs for the door hinge, 2 places on
Front Floor (A)
.
c.
Drill pilot hole through top surface of floor, 2 places on
Front Floor (A)
.
d.
A
Using a rubber mallet and
screwdriver, punch out
the screw holes along
the connection edge
of
Repeat Floor (B)
.
a.
B
Using a utility knife, cut the long side of each wall slot
tab and then use a rubber mallet and screwdriver to
knock it completely out:
• 4 places on
Front Floor (A)
• 8 places on
Repeat Floor (B)
b.
A
B
1.
2.
CAUTION:
Drill through top surface of floor only!