2
Page 3
Prep and layout tables for all pivot doors
Page 4 - 7
2-Sided shower
Page 8 - 12
3-Sided Alcove shower
NEWLINE RECOMMENDS A SKILLED TRADESMAN ACQUAINTED WITH
SHOWER INSTALLATIONS TO ENSURE THE VERY BEST OUTCOME.
PIVOT DOOR SETS 2-SIDED & ALCOVE APPLICATIONS
WARRANTY
Faulty goods are covered under warranty. Visit www.newline.co.nz for warranty information.
Breakages incurred during construction are not covered under warranty.
Installations must conform to the instructions to be covered by the warranty.
INSTRUCTIONS
Tray and liner instructions:
Come with the specific tray supplied
Shower waste and supply fittings:
Must be installed by a registered plumber.
HEALTH AND SAFETY
Toughened Glass:
• Do not rework precut glass panels. Cutting or altering a glass panel will cause it to explode without warning.
•
Unpack all glass assemblies. Stand glass on soft packaging on the floor and against a wall. Care must be taken
not to strike any edge or corner against a hard surface as this will chip and destroy the glass panel.
Installation:
• Glass panels and assemblies are heavy. Two man lifting is recommend for handling and installation.
• Determine positioning of wiring and piping within wall cavities before shower installation. Mark their positions to
ensure electrical and piping areas are avoided.
• Wear appropriate protective clothing and eye protection during installation.
MATERIALS REQUIRED
Sika Silaflex NG translucent silicone.
TOOLS REQUIRED
AFTERCARE
The shower must be squeegeed down after each shower. Thoroughly clean weekly with a microfiber cloth, mild
detergent and water. Rinse with clean water and squeegee and wiped dry.
NOTE: ACRYLIC TRAY & LINER
- Detailed Instructions for both are packed with shower tray.
INDEX