- Installation instructions for supplementary outriggers -
Via Mediterraneo, 6 - 42022 - Boretto - Reggio Emilia - Italy
Tel. +39 - 0522-96 30 08 - Fax +39 - 0522-96 30 39
info@maxiliftcrane.com
- 17 -
11.4 Dual side controls kit c/w valve bank
This kit is used in case you wish to operate the rear stabilizer directly by a valve bank installed on it.
Normally the hoses for connection to the cylinders and the valve bank pass under the stabilizer, and are
suitable for installation under the
chassis.
If you want to install the
stabilizer on the chassis, this
must be specified on order, so
that the original run of the hoses
can be modified.
There are 3 available types of
dual side controls kits:
A)
for stabilizers c/w
hydraulically extendable side-by-
side rods
B)
for stabilizers c/w
hydraulically
extendable opposite rods
C)
for fixed or manually
extendable stabilizers.
The operation levers are
arranged in order to allow only
the operation of the functions
related to their location side.
(see Pict. 19)
ATTENTION
The distributor valve bank is
supplied with a standard pre-
set value of
80 bar
on its main
relief valve. Some models of
stabilizers
(see Table 2)
require a setting of
150 bar
on
the section directing the lateral
beam extension. In these
cases adjust the main relief
valve (checking the pressure
with a manometer gauge on
the P port) until the desired
value is achieved.
Pict. 19
!