1. Position the assembled bed base to side rails
3 and centre rail 4 and firmly insert the pins of
the slat caps (F&G) into the holes in each rail.
2. Repeat with all slats to attach the bed base.
IMPORTANT:
Once the feet have been assembled and
attached, they should be adjusted to ensure they
do not touch the floor (5mm above the floor), to
allow for movement once the mattress is placed
on the bed frame.
It is important to note that when moving the bed
that it is not dragged into its new position to
prevent the possibility of these feet being
twisted or angled to one side, which could lead
to the collapse of the centre of the bed.
To move the bed, remove the mattress and lift
the bed into the new position to avoid damage.
Ensure the feet are at 90° to the floor before
replacing the mattress.
STEP SIX
STEP SEVEN
Page 4 of 5