5
Hanging bolts
1.2. Installation
This section describes the installation steps and requirements.
1. Notices before the installation-
1) Personnel protection requires a safety helmet and work gloves.
2) Set the security scope of the unpacking and hanging area. Except the relevant staff, other personnel are prohibited
from entering.
3) License is needed to operate the relevant cranes or stacker.
4) Check if the hanger bolts are locked and the safety of hanging equipment such as slings.
2. Unpacking the box-
The press-fit machine and other separated parts are all packed in plastic film, and sea or air packing box plus
aluminum foil blister packaging to protect it. Please remove foil pouch or film wrap (except for X-Y Table and
screen bracket's fixed film) and take out the other separated parts.
3. Hanging operation-
Firstly take off the force plate of the fixed base, and hang the sling over the hanging bolts on both sides of the
upper part of the device (below). Take care not to touch the motor with the slings or other parts. Then use a crane or
forklift to lift the press-fit machine away from the load-bearing plate, lift and place it on the work table.
Make sure that the placement table must be leveled and pay attention to the location of the keyhole.
4. Lock and adjust the machine-
1) The mounting hole size of the device is 310mm*450mm, and the mounting hole diameter is 13mm*4 holes.
2) When the equipment is hung and placed 50~100mm away from the desktop, stop first, then insert the attachment
bolt size M12-60Lmm*4pcs. Then slowly lower the bolts while guiding the counter mounting holes in the table.
3) Place the washer and nut under the table from the underside of the bolt and secure it with a movable wrench.
There are 4 seats in the machine seat.
4) Place a horizontal device on the X-Y Table and rotate the tripod of the table to adjust the level of the X/Y axis.
5. Power-
1) The equipment uses 220V AC 1ψ 15Amp single-phase AC.
2) Connect the power box to the power cable of the device beforehand. The cable specification is three-wire
220V AC 1ψ15Amp.
3) Make sure the power supply box is powered off.
4) The no-fuse switch in the device power box is OFF (left).
5) Make sure the power on the front panel of the device is
turned OFF.
6) Make sure the power supply and equipment grounding
Protection are ready.
Connection point of power cable