2.7
Simple Operation Check
DP060LM/DP120LM/DP180LM
23
2.7
Simple Operation Check
This section describes how to perform a simple operation check when you purchased a new product,
or after storing the product for a long period. This check should be performed without load. If you
are not satisfied with the results verified at the operation check, please request the repair to us or our
agent.
Operation procedure
1.
Connect the product to the mains referring to "
2.4 Grounding and Power Connections
".
2.
Attach the resin-molded output terminal cover and the output cable holder without connecting
anything to the output terminals or any other terminal/connector.
3.
Switch on the breaker of the distribution board, and then turn on the power switch of this product.
Check that all LEDs on the control panel illuminate for several seconds, and then turn off, and that
our logo mark appears on the LCD screen (see
3.2.3)
. If LAN interface is equipped, "LXI" is
displayed below the logo mark.
Summary of Contents for DP060LM
Page 1: ...PROGRAMMABLE AC POWER SOURCE DP060LM DP120LM DP180LM INSTRUCTION MANUAL NF Corporation...
Page 2: ......
Page 3: ...PROGRAMMABLE AC POWER SOURCE DP060LM DP120LM DP180LM INSTRUCTION MANUAL DA00059920 004...
Page 4: ......
Page 19: ...DP060LM DP120LM DP180LM 1 1 Outline 1 1 Overview 2 1 2 Series Lineup 2 1 3 Features 3...
Page 24: ......
Page 224: ......
Page 244: ......
Page 264: ......
Page 300: ...11 Specifications PROGRAMMABLE AC POWER SOURCE 282 Figure 11 4 DP180LM Type5L cabinet...