Step 22:
•
Place each swing hook through the pre-drilled holes of the 3m monkey bar post, secure
using the appropriate spanner
Step 23: Steps Assembly
•
The steps might have to be cut or dug into place (depending on the slope of your surface)
•
They are secured using decking screws through the top and sides of the steps into the base
of the tower. Again, ensure these holes are well pre-drilled to avoid splitting. The holes and
screws will have to be angled to the surface of the steps