Step 32: Screw Cover Assembly
•
Press the screw covers into each of the 32mm holes on the 4 vertical posts that make up the
H-Frame and the holes on the A-frame
Step 33: Concreting structure
•
Using postcrete and following the
manufacturer’s instructions, concrete all the posts into
the ground
•
The frame should be left overnight before it is used to ensure the postcrete has dried