Step 4:
•
You are now ready to level your frame. Ensure that the swing bar is level, as well as the two
3” x 1.5” braces you just screwed on. If you are concreting your posts into the ground, which
we recommend, we suggest digging holes roughly 300mm x 300mm wide, and the depth will
depend on the slope of your garden. Ideally you would want to put at least 200mm of
concrete around each post, leaving enough room to replace the sod of grass on top, once
the concrete has fully dried
•
Using postcrete and following the manufacturers instruction concrete all 6 posts into the
ground
•
The frame should be left overnight before it is used to ensure the postcrete has dried
Summary of Contents for Double Mississippi
Page 1: ...Double Mississippi Swing Set Instruction Manual ...
Page 10: ......