Step 3:
•
Make a mark 2400mm (2.4m) from the top of all three 3m posts.
•
Using a piece of 3.6
m 3” x 1.5” timber and the 65mm decking screws, screw the timber to
the 3m posts at the 2.4m mark you made on the posts (this is to strengthen the structure,
without this additional support at the bottom the frame will twist once it is lifted up)
•
You can also use the 2220mm x 3
”
x 1.5
”
and the 1110mm x 3
”
x 1.5
”
to support the frame if
needed
Summary of Contents for Hangout Climbing Frame
Page 1: ...Hangout Climbing Frame Instruction Manual ...
Page 6: ...16 3 6m x 3 x 1 5 2 17 1575mm x 3 x 1 5 5 18 Set of steps 1 19 Screw covers Approx 20 ...
Page 15: ...Step 5 Repeat steps 1 4 for the second half of the structure ...
Page 22: ...Step 12 Repeat steps 10 and 11 for each railing ...
Page 26: ... Repeat this for the three sides that are to be enclosed ...
Page 31: ......
Page 36: ...Step 26 Lower H Frame Supports Removal Remove the lower H frame supports from the tower ...