Step 17:
•
Measure down from the top of the ‘A’ post 900mm to both posts and place the 1755mm 3”
x 1.5” timber across both posts and secure these into place with decking screws
•
Cut the 1755mm 3” x 1.5” timber so that it is flush on both sides of the A
-frame
Step 18:
•
Place each swing hook through the pre-drilled holes of the 3m post that is square on both
ends, secure using the appropriate spanner
Summary of Contents for Hangout Climbing Frame
Page 1: ...Hangout Climbing Frame Instruction Manual ...
Page 6: ...16 3 6m x 3 x 1 5 2 17 1575mm x 3 x 1 5 5 18 Set of steps 1 19 Screw covers Approx 20 ...
Page 15: ...Step 5 Repeat steps 1 4 for the second half of the structure ...
Page 22: ...Step 12 Repeat steps 10 and 11 for each railing ...
Page 26: ... Repeat this for the three sides that are to be enclosed ...
Page 31: ......
Page 36: ...Step 26 Lower H Frame Supports Removal Remove the lower H frame supports from the tower ...