background image

Electrical connection HBS 12/HBS 16

NOTE

All electrical connections must be carried out by an

authorised electrician.

Electrical installation and wiring must be carried out

in accordance with the stipulations in force.

HBS 12/HBS 16 must not be powered when installing

ACK 28.

The electrical circuit diagram is at the end of these installation
instructions.

Following cables for ACK 28 are used in this kit: 0101 to
0112.

1.

Remove the display unit (AA4).

2.

The supplied relay card (AA7) is installed on the existing
relay card (AA6) using the plastic turrets, see image be-
low.

3.

Connect the edge connector wiring between the sup-
plied relay card (AA7) and relay card (AA6) as illustrated
below.

HAHN

LEK

Relay card, -AA6

Relay card, -AA7

4.

The corresponding wiring with flat pin sleeves and zero
numbers 0101 to 0103 are installed as follows:

Brown cables with zero number 0101 and 0102 to
flat pin AA7:37.

-

Brown cables with zero number 0102 and 0103 to
flat pin AA7:39.

-

Brown (single) cable with zero number 0103 to flat
pin AA7:41.

-

5.

Mount the terminal blocks, label and strain relief on the
mounting plate. Screw the plate into place with two
accompanying M5 self-tapping torx screws, see image
below.

M5, self-tapping torx

screws

Electrical connection,

X6

PE

LEK

Electrical

connection, X6

AA7

AA6

PE2

AA4

ACK 28

8

GB

Reviews: