- 12 -
3.1
INSTALLATION REGULATIONS
-
When active, both the element and the termowell have to be surrounded with a sufficient amount
of water from all sides.
-
Thermo water flow must not be prevented.
-
Mounting positions
–
horizontal or vertical from under.
-
The length of the 6/4“ neck shall not exceed 70 mm. If longer, the variant with an extended cooling
circuit has to be used.
-
If the length of the neck is within 100 mm, it has to be extended on the water side, or undercut in a
minimum length of 40 mm to the minimal diameter of 50 mm.
-
The maximum pressure in the vessel is 10 bar.
Both the electric and water installation must follow and meet the requirements
and regulations relevant in the country of use!
3.1.1
OPERATIONAL STATUS
Figure 8