F2015 docked to the oil-fired/pellet boiler together with SMO 10 and water heater (floating con-
densing)
VXV1
PG
SMO 10
HR
HR
HR
HR
SF
RV
P
FG1
CP1
RG1
SV1
VVG
LP1
UG
SÄV
FIGHTER 2020
)
SMO 10 controls F2015, oil-fired boiler, circulation pumps,
shunts, etc. F2015 works with floating condensing against
the heating system and prioritises hot water charging via the
three way valve (VXV1).
If F2015 cannot meet the heating requirement, the oil-fired
boiler is started and additional heat is shunted in.
NOTE
To prevent interference, sensor cables and communic-
ation cables must be separated (min 20 cm) from high
voltage cables when cable routing.
F2015
8
For the Installer
Docking
Summary of Contents for F2015
Page 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS MOS GB 1008 3 F2015 031239 F2015 LEK ...
Page 2: ......
Page 27: ...Electrical circuit diagram 1x230V 6 11 kW 25 F2015 Miscellaneous Electrical circuit diagram ...
Page 28: ...F2015 26 Miscellaneous Electrical circuit diagram ...
Page 29: ...27 F2015 Miscellaneous Electrical circuit diagram ...
Page 30: ...F2015 28 Miscellaneous Electrical circuit diagram ...
Page 40: ...F2015 38 ...
Page 41: ...39 F2015 ...
Page 42: ...F2015 40 ...
Page 43: ......