Preparations
• Check that the air filters are clean, they can become
dirty after installation.
Filling
• Check that there is water in the water seal, fill if ne-
cessary.
Start-up and
inspection
COMMISSIONING
The first time the installation is started, a start guide is
launched. In the start guide, you select the language
you want in the display.
Caution
As long as the start guide is active, no function
in GV-HR 120 will start automatically.
OPERATION IN THE START GUIDE
1.
Press the Next button to scroll between the select-
able languages.
2.
Select language by pressing "
".
After the language has been chosen, GV-HR 120 will
enter the appropriate program version in the selected
language, which takes approx. 1.5 minutes.
SD CARD
After commissioning GV-HR 120, it is possible to have
the installation in operation without an SD card (AA32),
but there will then not be any help texts in the display.
SETTING THE VENTILATION
The ventilation must be set according to applicable
standards. Adjust the supply air flow to guarantee a
negative pressure.
The settings are adjusted in Service menu, menu 10-15.
Even if ventilation is roughly set at installation it is im-
portant that a ventilation adjustment is ordered and
permitted.
Caution
An incorrectly set ventilation flow can damage
the house and may also increase energy con-
sumption.
NOTE
Order a ventilation adjustment to complete the
setting.
Ventilation capacity
0
0
10
20
30
40
50
60
70
80
90 100 110 120
100
200
300
400
500
600
Tillgängligt tryck
(Pa)
Flöde
(l/s)
30%
100%
80%
60%
40%
50%
70%
90%
Available pressure
Airflow
Fan rating
1
0
10
0
20
30
40
50
60
70
80
90 100 110 120 130
10
20
30
40
50
60
70
80
90
Effekt
(W)
Flöde
(l/s)
30%
100%
80%
60%
50%
90%
70%
40%
Output
Airflow
1
The diagram shows the power consumption per fan.
NIBE GV-HR 120-400
Chapter 6 | Commissioning and adjusting
16
6 Commissioning and adjusting