Electric installations

The electric installations must be performed by an

authorised electrician. See the electric wiring diagram

included. The cable between the aggregate and control

panel is a 4-lead cable, max. 50m.

Control and settings of the facility

For optimal operation of the facility it must be set using

technical ventilation measurement instruments.

To use the facility before installing, do the following:

Before using the facility:

1:  Check that the NIBE-aggregate is correctly mounted

  and that all the ducts are insulated according to

 instructions.

2:  Check that the lid can be opened so that service and

  maintenance of the aggregate can be performed.

3:  Check that the filter is clean 

  (may be dirty after assembly)

4:  Check that the condensation drain is correctly

  mounted with a waterseal and that it is protected

  from frost. Pour 1 litre of water into the condensation

  container and check that it flows unimpeded through

  the condensation drain pipe.

5:  Set all incoming air units so that the unit

  closest to the aggregate will open 3 turns from the

  locked position while the outermost will open 8 turns

  from the locked position. The unit in-between will

  open between 4-7 turns, depending on how close to

  the aggregate they are.

6:  If a postheater is assembled (not sold by NIBE) on the

  facility set the incoming air temperature to 0-3 °C

  below the room temperature of the residence.

The facility can now be used and run until the facility

is adjusted using technical ventilation measurement

instruments.

Optimal adjustment of the facility

Calibrated technical ventilation equipment must be used

to adjust a NIBE-ventilation facility for residences.

Before adjusting, check that the 6 items in the section

on control and settings have been performed. The

facility can then be used.

Summary of Contents for GV-HR110

Page 1: ...k NIBE A S Sverigesvej 6 DK 6100 Haderslev Tlf 45 7353 2700 www NIBE dk NIBE AB Sweden Box 14 Hannabadsv gen 5 SE 285 21 Markaryd www NIBE eu INSTALLATIONS MANUAL Passive ventilation Heat recovery GV...

Page 2: ...tics 7 Insulating ducts in warm rooms 8 Reheating of the supply air 8 Electric installations 9 Control and settings of the facility 9 Optimal adjustment of the facility 9 Facility maintenance 10 Troub...

Page 3: ...a thermostat and an electric heating element that switches on when the temperature falls below 2 C IMPORTANT IMPORTANT IMPORTANT IMPORTANT 7 Set the amount of incoming 1 and outgoing air before using...

Page 4: ...r 10 El kasse 11 Kondensvandsbakke 12 Kondensvandsafl b 13 230V 50Hz 14 By pass 2 4 13 72 7 60 7 550 42 1014 24 32 1088 1056 550 135 280 4 Subject to Technical Modifications of GV HR110 GV HR110 Assem...

Page 5: ...in the picture A A Visible wall mountings Concealed wall mountings Cabinet assembly gummif dder som leveret ved vandret montage af maskinen skal de leverede gummif dder flyttes til positioner som anvi...

Page 6: ...he condensation drain side The waterseal must be airtight e g by bending a 15 mm copper pipe as a waterseal see the drawing on the left A reinforced water hose is attached between the drain connection...

Page 7: ...even thicker insulation to avoid warm air in the attic from heating the incoming air during the summer Make sure that the closures are tight where the exhaust air duct comes through the roof or throu...

Page 8: ...ated in menu 4 5 User menu and that the setpoint temperature is set in menu 4 8 Service Menu Recommended setpoint is 3 C Reheating of the supply air Since the counterflow heat exchanger cannot recycle...

Page 9: ...ectly mounted with a waterseal and that it is protected from frost Pour 1 litre of water into the condensation container and check that it flows unimpeded through the condensation drain pipe 5 Set all...

Page 10: ...the procedure both knobs must be turned one quarter turn clockwise to the right When the filter has been exchanged or cleaned by shaking them to remove most of the dirt the filter timer is set by pre...

Page 11: ...amage the plates The effect will no longer be optimal if the plates are damaged Fans Remember to switch of the power supply Check the fans in the fan wheel for dirt every third year The four outermost...

Page 12: ...st No incoming air to the residence Error Faulty fan Fouled incoming air filter Fouled outside air grid A fuse has blown on the circuit board No power supply to the facility No exhaust air from the re...

Page 13: ...Belimo Bypass 230VAC H7 R10 Fan extract air 230VAC H8 R12 ON OFF Bypass 2x230VAC H9 R10 Fan supply air 230VAC bypass H16 R8 AUX relay 230VAC max 20W H17 R9 AUX relay 230VAC max 20W 1 1 1 1 1 1 1 1 1 1...

Page 14: ...Brown Brown Blue Blue Yellow green Yellow green Water valve Belimo Bypass Humidity sensor White Red Blue EC fan Supply air Aux relay R8 1x230V 50Hz ONLY control current Red Brown Blue Green Yellow Wh...

Page 15: ...dards hergestellt Directive a Machinery 2006 42 EC 15 March 2006 b Low Voltage 2006 95 EU 12 December 2006 c Electromagnetic Compatibility 2004 108 EC 15 December 2004 d Radio Telecommunication 99 5 E...

Page 16: ...294 71 Benatky nad Jizerou Tel 420 326 373 801 Fax 420 326 373 803 E mail nibe nibe cz www nibe cz PL NL FI DK DE CZ NIBE Energy Systems OY Juurakkotie 3 01510 Vantaa 3C Broom Business Park Bridge Wa...

Reviews: