x 10
LEK
LEK
Coach bolt M10
Flashing tape
Rubber washer
L profile
Nut M10
2. Install the L profile on the protruding coach bolt
with M10 nuts.
Caution
The coach bolt should be installed from un-
derneath before the plate is mounted on the
roof.
Caution
Never use the installed roof brackets as a
ladder!
Installing the mounting rails
Mounting rails are secured in the roof brackets with
T bolts and locking nuts (8 mm).
Caution
Check that the head of the T-bolt is vertical
in the mounting rail after tightening.
The rectangular hole in the roof bracket permits op-
timal height adjustment of the mounting rail.
Adjustment of the mounting rail height
Adjust the first mounting rails installed in relation to
each other and the roof cladding. Then fix the
mounting rail to the roof bracket by tightening the
nut. Tightening torque 12-15 Nm.
13
Chapter 4 |
Mounting
PV Solar package
Summary of Contents for PV 3031 3 kW
Page 1: ...Installer manual PV Solar package Accessories IHB GB 1608 2 331737...
Page 2: ......
Page 25: ......
Page 26: ......
Page 27: ......