Replacing the display (AA4)
1.
Remove the connector from the underside of the
display unit, push in the catches in the display unit
upper rear side towards you and lift the old display
unit from its mountings.
LEK
2.
Install the new display unit in reverse order.
NIBE Uplink™
Connect the network connected cable (straight, Cat.5e
UTP) with RJ45-contact (male) to contact AA4-X9 on the
display unit (as illustrated). Use the cable gland (UB3) in
the heat pump for cable routing.
LEK
$$;
10
GB