CAUTIONS AND NOTES
4
EXTREMELY IMPORTANT
4
ETL DEFINITIONS COMPLIANT TO UL325
4
1 - OVERVIEW
4
1.1
- Main control board 4
1.2
- Main control board specifics 4
2 - GATE INFORMATION
4
2.1
- ASTM F2200 4
2.2
- Gate latches 5
2.3
- Specific applications 5
2.4
- Swing gates 5
2.5
- General requirements
5
3 - SAFETY AND CAUTIONS
5
3.1
- Properly installed safety devices 5
3.2
- Safety signs, notices to personnel warning signs 5
3.3
- Gate system safety devices 6
3.4
- Infrared beams and warning signs 6
3.5
- Establish the location 6
3.6
- Read and follow all instructions 6
3.7
- Keep children away 6
3.8
- Test the gate system
6
3.9
- Keep gates properly maintained
6
4 - INSTALLATION NOTES
4.1
- Follow Instructions 6
4.2
- Intended usage 6
4.3
- Warnings, cautions and notes 6
5 - CIRCUIT BOARD LAYOUT
8
6 - PARTS IDENTIFICATION
8
7 - DISASSEMBLE MOTOR
9
8 - MOUNTING BRACKET INSTALLATION
9
9 - ARM ASSEMBLY
10
10 - GATE BRACKET INSTALLATION
10
11 - CONTROL BOX MOUNTING
11
12 - MOTOR WIRING
11
13 - LIMIT AND MOTOR CONNECTION TO THE BOARD
11
14 - INCOMING POWER WIRING
12
15 - LIMIT SWITCH ADJUSTMENT
13
16 - REPLACE COVER
13
17 - LEARNING MODE
14
18 - ACCESSORY INPUTS AND OUTPUTS
15
18.1
- Outputs 15
18.2
- Inputs 15
18.3
- Communication buses 16
18.4
- Programming the plug-in receiver and remote controls 16
19 - 120VAC POWER WIRING
17
20 - SOLAR PANEL CHART
17
21 - OPTIONAL INPUTS
18
21.1
- Fire dept. connection
18
21.2
- Magnetic lock connection
18
21.3
- Guard station
18
21.4
- Exit and edge inputs wiring diagram
18
21.5
- Radio receiver connection (third party)
19
21.6
- Optional power output
19
22 - INSPECTION AND OPERATION
19
23 - GENERAL LAYOUT AND SAFETY ACCESS
20
24 - ACCESSORIES AND SENSORS
21
25 - BOARD NOMENCLATURE
22
26 - PROGRAMMING BUTTONS
23
26.1
- Force
23
26.2
- Speed 23
26.3
- Acceleration
23
26.4
- Delay
23
26.5
- Function 23
26.6
- Display
24
27 - EMERGENCY VEHICLE ACCESS
25
28 - GLOSSARY
25
29 - MAINTENANCE SCHEDULE
26
30 - TROUBLESHOOTING
26
31 - CONTROL BOX DIMENSIONS
27
32 - EXPLODED VIEW
28
33 - WARRANTY
29
34 - INSTALLATION CHECKLIST
31
TABLE OF CONTENTS
Summary of Contents for H12-ETL-1K
Page 2: ......
Page 27: ...27 1 1 2 2 A A B B COMPANY NICE APOLLO NAME CONTROL BOX GENERAL OVERVIEW 18 22 18 18 8 32...
Page 30: ...30...