36
Left box is for installer check off and the right box is for customer
check off.
1. The gate has been checked to make sure it is level and moves freely in both di-
rections.
2. Potential pinch areas have been guarded so as to be inaccessible OR have con-
tact and/or non-contact obstruction sensing devices installed.
3. The installer has installed one or more contact or non-contact obstruction
sensing devices, in compliance with UL325 requirements for this installation.
4. If pedestrian traffic is expected, a separate pedestrian gate has been installed, a
minimum of seven feet from the gate. The customer has been informed that all
pedestrian traffic must use the pedestrian gate.
5. Warning signs have been installed on each side of the gate in highly visible lo-
cations. The customer has been informed that these signs must remain at all
times.
6. There are no controls installed on the gate operator, or within 8 feet of the gate.
7. The installer has properly adjusted the obstruction sensing feature and has
tested the gate to make sure that the gate stops and reverses a short distance
with minimal resistance applied (Approximately 40 lbs. on a swing gate, at the
end of the gate.
8. The installer has instructed the customer in the proper use of the gate operator
and reviewed all of the operational functions, obstruction sensing devices,
warning beeper and reset, etc.
9. The installer has instructed the customer in the proper use of the operator’s
manual disconnect feature. The manual dis-connect must never be used while
the gate is in motion. The power switch must be turned off before using the
manual disconnect and disengaging the operator.
10. The installer has reviewed all safety instructions with the customer, and has left
the safety instructions and owner’s information sheets for their reference.
11. The installer has answered any questions the customer has regarding the oper-
ation of the gate operator and gate operator safety precautions.
12.
The installer has explained to the customer that a regular maintenance sched-
ule for both the gate and the gate operator is recommended.
18 - INSTALLATION CHECKLIST
Installation Acceptance__________________________________
Address where opener is located___________________________
Installer name, number and address________________________
End user name and telephone number
___________________________
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑