The following checklist should be used before beginning installation:

Verify that the proper operator has been selected for this application.

Determine the general location of the operator,  access controls, and solar
panel (if used).

1. Is there a suitable location for the operator?
2.Can the solar panel (if used) be mounted in an unobstructed area facing
   south?
3. Will additional solar panel cable be required? If additional cable is required,
    do not cut out the blocking diode when adding the cable.
4. Is electricity available (if required)?

Consider safety and access options. Recommend if needed.

1. Will there be chidren or animals in the area?
2. Are safety loops, edge switches, or photo eye detectors required? The auto
    close feature is not recommended unless one or more of these devices are
    used.
3. How can the gate be opened in emergencies?
4. How will visitors enter and exit?
5. Will vehicles (and trailers) have sufficient room off roadway to operate
    access control devices such as keypads?

PRE-INSTALLATION CHECKLIST

Summary of Contents for T5-ETL

Page 1: ...INSTALLATION MANUAL 7 10 T5 ETL T7 ETL 12 VOLT DC Swing Gate Operator...

Page 2: ...d Actuator Installation 8 Limit Adjustments 9 Electrical Connections 11 Battery Connections 12 Encoder Board Connections 13 Dimensions and Options 14 Programming Current Sensing 15 Control Board 16 Si...

Page 3: ...with operator controls Keep the remote con trol away from children Always keep people and objects away from the gate NO ONE SHOULD CROSS THE PATH OF THE MOVING GATE ARM Test the operator monthly see...

Page 4: ...ower outages The battery may be recharged with a trickle charger or by solar energy eliminating the need for costly trenching to remote entrances If a trickle charger is used and a standard electrical...

Page 5: ...d If additional cable is required do not cut out the blocking diode when adding the cable 4 Is electricity available if required Consider safety and access options Recommend if needed 1 Will there be...

Page 6: ...s Toona 5 TO5012 Toona 7 TO7012 i a Actuator b Gate attach bracket two pieces c Pivot bracket d Mounting Hardware e Release lock keys f Control Box g Cable Harness h Caution signs 2 i Battery Charger...

Page 7: ...A B Toona 5 7 1 16 7 1 16 Toona 7 7 3 4 7 3 4 These dimensions are for 4 post with hinge in center Adjust ac cordingly if post size or hinge loca tion varies A B should always be same value Pull to o...

Page 8: ...8 TOONA 5 F 1 75 TOONA 7 F 2...

Page 9: ...9 Toona 5 7 3 9 max Limit Switch Adjustment Loosen nuts and adjust limits Retighten nuts Nuts may be hex or socket...

Page 10: ...10...

Page 11: ...11 T5 ETL Actuator Wiring T7 ETL Limit Wires The limit wires orange and white are reversed on the T7 ETL from the picture shown...

Page 12: ...r battery is recommended with solar charging G CELL 12 Volt 34aH Sealed Battery Connect the two ring terminals on the connec tor end of the cable to the battery The battery charger or solar panel shou...

Page 13: ...13 SIREN GND ACTUATOR CABLE BLUE TOONA Wiring Diagram YELLOW YELLOW RED BLACK...

Page 14: ...14 4 5 4 125 38 5 5 9 47 25 Description 1 Actuator 5 Keypad 2 Photo Beam 6 Siren 3 External Stop 7 Solenoid Lock 4 Photo Beam 8 Control Box Optional 5...

Page 15: ...his procedure 1 Press and hold the LED ENABLE button for five seconds and release The STOP LED will blink indicating that the board is in learn mode 3 Cycle gate arm for 3 4 full cycles The STOP LED w...

Page 16: ...Battery Polarity Indicators Optional Device Input Remote Monitor Outputs Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 835 836 Control Board Parts Iden...

Page 17: ...ximum travel or the 15 amp fuse will open Fuse should be checked before returning gate to service EMERGENCY BYPASS 12V Supplied battery voltage SLV Slave Operator Indicator indicates slave side of gat...

Page 18: ...to assist in installation and troubleshooting Hold the push button down for five seconds to put the board in program mode RESET Resets the microprocessor Returns processor to last known state Jumpers...

Page 19: ...eased 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 COAST ENABLE Gate will stop immediately when at Gate will coast min...

Page 20: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Page 21: ...or on the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation...

Page 22: ...22 PUSH TO OPEN APPLICATION...

Page 23: ...23...

Page 24: ...itches to the same position Transmitters must match code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC Multi...

Page 25: ...Sealed Lead Acid Recommended Battery solar charged 12 V 105 aH Battery Charger 1 5 or 6 amp Automatic Recommended Solar Panel 5 watt minimum Duty Cycle Continuous Operating Temperature 400 F 1500 F Cu...

Page 26: ...lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In case of failure due to defective material or workmanship during t...