background image

English – 

9

4

ELECTRICAL CONNECTIONS

CAUTION!
–  Incorrect connections can cause faults or hazards; therefore ensure that the specified connections are strictly observed.
–  Hook up the unit with the electrical power shut off.

The gear motor is supplied with an electric power input cable measuring 2 m. Therefore, if a gr

eater distance must be covered to perform the 

electric connections, a diversion box must be used (not supplied).

 IMPORTANT! – It is prohibited to join the electric cable inside the 

foundation case.

To connect the power input cable to the control unit, see the manual regarding the latter and the following indications:

• For 

LFAB4000

 connect the cables as follows:

WIRE

CONNECTION

Black wire

“Open” phase

Brown wire

“Close” phase

Grey wire

Common

Yellow/Green wire

Earth

• For 

BFAB5024

 - 

LFAB4024

 - 

LFAB4024HS

 connect the ca-

bles as follows:

WIRE

CONNECTION

Blu wire

24 V motor power supply

Brown wire

24 V motor power supply

Black wire

Encoder

Grey wire

Encoder

Yellow/Green wire

Earth

5

AUTOMATION TESTING

These are the most important stages in the automation’s construction in order to ensure maximum safety. Testing can also be adopted as a 

method for periodically checking that all the various devices in the system are functioning correctly.

Caution!

 – 

In order to limit impact forces, a sensitive edge must be used.

Testing of the entire system must be performed by qualified and experienced personnel 

who must establish which tests to conduct on 

the basis of the risks involved, and verify the compliance of the system with applicable regulations, legislation and standards, in particular with all the 

provisions of 

EN 13241-1 which establishes the test methods for automation systems for gates.

5.1 - Testing

Each component of the system, (safety edges, photocells, emergency stop, etc.) requires a specific testing phase. To do so, follow the proce

-

dures given in the instruction manuals. 
Run the test as follows:

01.

Ensure that the instructions outlined in this manual and in particular in chapter 1 have been observed in full

02.

Close the gate

03.

A

TTENTION! – 

Remove any electric power input source to the control unit

04.

Release the gear motor using the relative wrench

05.

Open the panel manually until the maximum opening position is reached and check that there is no friction during the movement

06.

Check that the panel, left in any position of its run, does not move

07.

Check that the safety systems and the mechanical stops are in good working order

08.

Check that the screw connections are well-fastened

09.

If necessary, clean the inside of the foundation case and check that the water drain functions correctly

10.

Block the gear motor using the relative wrench

11.

Apply the electric power input to the control unit

12.

Measure the force of impact according to that envisioned by the EN 12445 Standard. If the control of the “driving force” is used by the 

control unit as an auxiliary to the system for the reduction of the force of impact, try and adjust the functions that offer better parame-

ters. LFAB(...) / BFAB(...) is not equipped with any torque adjustment device, therefore this operation is performed by the control unit

13.

Permanently fix a label, which describes how to manually release the gear motor, in a zone adjacent to the automation

5.2 - Commissioning

Commissioning may only be done when all the gearmotor tests specified in par. 5.1, and those of the other equipment, have been passed: to 

commission the unit, refer to the control unit manual.

IMPORTANT - It is not permissible to execute partial commissioning or to enable use of the system in makeshift conditions.

Summary of Contents for BFAB5024

Page 1: ...English 1 Nice Swing gate opener LFAB4024 LFAB4000 BFAB5024 LFAB4024HS EN Instructions and warnings for installation and use...

Page 2: ...2 English...

Page 3: ...the gearmotor 8 3 2 Manually locking the gearmotor 8 4 ELECTRICAL CONNECTIONS 9 5 AUTOMATION TESTING 9 5 1 Testing 9 5 2 Commissioning 9 6 OPTIONAL ACCESSORIES 10 7 MAINTENANCE 10 8 DISPOSAL OF THE P...

Page 4: ...and increase the risk of danger or malfunction Should this happen stop installation immediately and contact Customer Service The manufacturer assumes no liability for damage to property items or perso...

Page 5: ...th encoder suitable for A6F A60 control units LFAB4024HS with encoder suitable for MC824H control units ATTENTION Do not use gear motors with incompatible control units 2 APPLICATION LIMITS Caution Th...

Page 6: ...com ponents These components are positioned according to the typical and usual layout With reference to fig 1 establish the approximate position where each component envisioned in the plant will be in...

Page 7: ...English 5 02 Place the box inside the foundation hole the stud must be aligned with the axis of the hinge 03 Bury the foundation box in concrete making sure it is set level 1 2 24h...

Page 8: ...previously removed washers and nuts 05 Mount the control bracket on the box s stud along with the ball Connect the gearmotor to the gate by means of the connecting lever 1 Release lever 2 Connecting l...

Page 9: ...02 Otherwise secure the opening limiter accessory to the box 1 Closing limit switch supplied with the motor 2 Opening limit switch supplied with the box 1 1 2 2 1 2 08 Fasten the cover with the screws...

Page 10: ...h and rotate it CW by 90 Follow this procedure for both gearmotors 4 3 2 1 3 2 Manually locking the gearmotor manual manoeuvre 01 Move the gate to the halfway open position by hand 02 Turn the lock co...

Page 11: ...ms for gates 5 1 Testing Each component of the system safety edges photocells emergency stop etc requires a specific testing phase To do so follow the proce dures given in the instruction manuals Run...

Page 12: ...pplies up again and run all the tests and checks described in Chapter 4 For the other equipment in the system refer to its user manuals 8 DISPOSAL OF THE PRODUCT This product is an integral part of th...

Page 13: ...f duration is strongly affected by the fatigue index of the manoeuvres performed by the automation i e the sum of all factors that contribute to wear of the product see Table 1 The estimation of durat...

Page 14: ...ordance with the provisions applicable to partly completed machinery Directive 2006 42 EC OF THE EUROPEAN PARLIAMENT AND COUNCIL of 17 May 2006 regarding machines and amending directive 95 16 EC conso...

Page 15: ...fter approximately 2 seconds the gate will start moving in the man present mode that is so long as the control is kept activated the gate will keep moving as soon as the control is released the gate w...