ENGLISH –
59
EN
3.7 INSTALLING THE GEARMOTOR
a
Incorrect installation may cause serious physical
injury to the person working on the system or to its
future users.
Before starting to assemble the automation,
complete the preliminary checks described in the “
” and “
”
paragraphs.
If there is a support surface:
1.
open the cubicle panel
15
2.
place the cubicle on the anchoring surface and mark the
points corresponding to the slots
16
3.
move the cubicle and drill the surface through the marked
points
4.
insert 4 expansion bolts (not supplied)
5.
arrange the cubicle properly and secure it with the
appropriate nuts and washers (not supplied).
17
If there is no support surface:
1.
dig the hole to insert the foundation plate
Note
The anchoring surface must be completely flat and
smooth. If the surface is made of concrete, the latter
must be at least 0,15 m thick and must be suitably
reinforced with iron cages. The concrete must have a
volume above 0.2 m
3
(a 0.25 m thickness corresponds
to 0.8 m
2
, that is, equal to a square base with sides each
measuring roughly 0.9 m). The plate can be anchored to
the concrete using the 4 expansion bolts, equipped with
12 MA screws capable of withstanding a tensile load of
at least 400 kg. If the anchoring surface is made of a
different material, it is necessary to verify its consistency
and whether the four anchoring points can withstand
a load of at least 1,000 kg. Use the 12 MA screws to
fasten the plate.
2.
arrange the pipes for routing the electrical cables
3.
fasten the four anchor bolts (
A
) to the foundation plate,
inserting a nut and washer (supplied) on each, on the
upper and lower sides of the plate
m
The lower nut must be screwed up to the end of the
thread.
A
B
18
Summary of Contents for L9BAR
Page 46: ...46 ITALIANO IT NOTE...
Page 95: ...ENGLISH 95 EN NOTES...
Page 144: ...144 FRAN AIS FR NOTES...
Page 193: ...ESPA OL 193 ES NOTAS...
Page 242: ...242 DEUTSCH DE ANMERKUNGEN...
Page 291: ...NEDERLANDS 291 NL OPMERKINGEN...
Page 340: ...340 POLSKI PL UWAGI...
Page 353: ...353 RU 3 7 a 1 15 2 16 3 4 4 5 17 1 0 15 0 2 3 0 25 0 8 2 0 9 4 12 400 1000 12 2 3 A m A B 18...
Page 354: ...354 RU 4 5 2 6 B 7 8 8 17 3 8 1 A A 19 2 B 3 B 20 m 4 C 6 C 21 5 D M BAR L BAR D D 22...
Page 355: ...355 RU 6 E E E 23 7 8 F G 1 F F F G G F F 24 9 H 10 I H I 25 11 J 12 6 J 26 l...
Page 357: ...357 RU 4 20 70 5 3 11 1 A 180 A A 30 2 1 A 2 1 A 180 2 U B 3 C A B C 31 4 5 U 6 A 7...
Page 358: ...358 RU 4 4 4 1 f a 1 A A 32 2 3 3 4 L N 33 5 34...
Page 363: ...363 RU 7 5 30 TX RX 41 8 20 50 9 EN 12445 10 200 20 1 11 6 2 a a a 1 2 42 42 3 4 5 6 l Nice...
Page 371: ...371 RU 1 1 24 10 2 2 24 10 3 3 24 10 4 4 24 10 24 10 OU4 xba7 24 0 5 0 5 Ogi OU4 xba8 2 1 3 2...
Page 384: ...384 RU 9 9 1 2 6 A A 57 3 4 B B 58 5 C STOP C C 59 6 7 a 60 8 LIGHT m LIGHT LIGHT 61...
Page 385: ...385 RU 9 62 10 6 63 9 10 XBA7 XBA8 Oview...
Page 386: ...386 RU 10 10 M L BAR a 1 6 20 000 2 3 4 5 11 11 l a l a...
Page 389: ...389 RU...
Page 390: ...390 RU a a a l 1 2 3 3 2 m m l 1...
Page 391: ...391 RU 1 A 180 A A 64 2 1 A 2 3 4 U 5 A 6...
Page 393: ...393 RU 22 ___ ___...
Page 394: ...394...
Page 395: ...395...