TESTING AND COMMISSIONING
device is triggered, switching from the active to the alarm status and
vice-versa; finally, make sure that it causes the intended action in the
control unit; for example that it causes the reversal of the movement
during the closing manoeuvre.
05.
Measure the force as specified in the standard EN 12445. If the motor
force control is used as an auxiliary function for reduction of impact
force, test and identify the setting that obtains the best results.
30
8.2 - COMMISSIONING
Commissioning can take place only after all testing phases have
been terminated successfully. Partial or “makeshift” commission-
ing is strictly prohibited.
01.
Draw up the technical dossier of the automation that should include
as a minimum: overall design (for example
fig. 1
), electrical connec-
––– STEP 8 –––
These are the most important stage in the automation system installation
procedure in order to ensure the maximum safety levels.
Testing can also be adopted as a method of periodically checking that all
the various devices in the system are functioning correctly.
CAUTION! – The system must be tested by skilled and quali-
fied personnel, who is responsible for defining the tests adopted
in relation to the risks present, and for ensuring observance of all
legal provisions, standards and regulations, with particular ref-
erence to all requirements of the EN 13241-1, EN 12445 and EN
12453 standards which defines the test methods for testing gate
automations.
8.1 - TESTING
01.
Ensure that you have strictly complied with the instructions
and warnings in STEP 1.
02.
Using the selector switch or the radio transmitter, carry out testing of
opening and closing the gate and check that the movement of the
leaves corresponds to what is expected. It is useful to perform sev-
eral tests to evaluate the freedom of movement of the gate and any
adjustment or installation faults, as well as the presence of particular
points of friction.
03.
Check the proper operation of all the safety devices, one by one
(photocells, safety edges, etc.). In particular, each time a device is
activated, the ECSbus led on the control unit flashes longer, confirm-
ing that the control unit has recognised this.
04.
To check the photocells and make sure that there is no interference
with other devices, pass a 5 cm diameter, 30 cm long cylinder (
fig.
30
) on the optical axis, first near TX, then near RX and finally at the
mid-point between them and make sure that in all these cases the
LED
T5
T2
T4
T3
T1
27
29
P1
LP1
LP2
LP3
P2
P3
28
led P1
led P2
led P3
M
M
M
M
FLASH
BUS
STOP
SbS
A
TX
RX
B
Summary of Contents for MAESTRO200 Series
Page 2: ......
Page 9: ...Français 7 Français E B A 6 Distance E minimum 400 mm 8 9 M8 V6 x 70 M6 10 11 12 13 7 ...
Page 10: ...8 Français Français OK b c d a Maximum 14 14 15 16 17 18 19 21 20 M8 M8 M8 M8 ...
Page 33: ...English 7 English E B A 6 Distance E minimum 400 mm 8 9 M8 V6 x 70 M6 10 11 12 13 7 ...
Page 34: ...8 English English OK b c d a Maximum 14 14 15 16 17 18 19 21 20 M8 M8 M8 M8 ...
Page 57: ...Italiano 7 Italiano E B A 6 Distanza E minimo 400 mm 8 9 M8 V6 x 70 M6 10 11 12 13 7 ...
Page 58: ...8 Italiano Italiano OK b c d a Massimo 14 14 15 16 17 18 19 21 20 M8 M8 M8 M8 ...
Page 81: ...Polski 7 Polski E B A 6 Odległość E minimum 400 mm 8 9 M8 V6 x 70 M6 10 11 12 13 7 ...
Page 82: ...8 Polski Polski OK b c d a Maksymalny 14 14 15 16 17 18 19 21 20 M8 M8 M8 M8 ...
Page 111: ......