8
Installing the cabinet.
06
02
Establish where the traffic barrier cabinet
mounting position needs to be.
If an concrete plinth already exists, skip to step
06.
If no concrete plinth is in place, continue on to
step 02.
Begin by digging a hole for the foundation plinth
to be cast in. In places where water can possibly
dam up and collect around the base, you will
want to use shutter boarding to generate a
raised plinth.
Once the hole has been dug, prepare your
cabling conduits. Ref: Cable requirements on
previous page.
Fasten the 4 J-bolt anchors onto the base plate
with one nut above and one nut below the base
plate.
NB!
the nut below the base plate must be
threaded all the way down to the end of the
thread on each bolt.
After pouring the concrete into the prepared
hole, press the base plate down onto the
concrete and ensure the base plate is
horizontally level on top of the concrete.
01.
02.
03.
04.
Allow sufficient time for the concrete to set and
cure before working with the mounting plinth
further. Typically this takes about 2 weeks.
After the concrete has set and cured sufficiently,
remove the 4 upper nuts from the now secured
bolts.
05.
Summary of Contents for WIDE L
Page 12: ...12 Adjusting the end stops...