Step 4: Base assembly (requires heavy lifting, please use at least 3 people)
•
The first step will be to position and pack your floor so that it is level and is not sagging or
bouncing in any places when someone stands on it. This will be made easier if your ground is
flat and fairly level. The greater the slope, the more packing you will require.
•
Once this is done, lift both ‘H’
-frames into the holes that have been dug out in the ground,
fitting into the notches that are cut in each corner of your floor.
•
Make sure that the 1800mm x
3”
x 1.5
’’ face each other on the inside of the H
-frames.
Summary of Contents for Las Vegas Commercial Climbing Frame
Page 1: ...Las Vegas Commercial Climbing Frame Instruction Manual...
Page 3: ...3 Rock Wall with baton 1 4 1617mm post 3 5 3m post 2...
Page 4: ...6 1435mm post 2 7 2420mm post with a piece of 3 x 1 5 secured to it 2 8 1275mm post 2...
Page 6: ...14 120mm screws 34 15 Sides for playhouse 2 16 Front for playhouse 1...
Page 21: ......
Page 24: ......
Page 27: ......
Page 31: ......
Page 33: ......
Page 35: ......
Page 37: ......
Page 42: ...Step 24 Use decking screws to secure the 4 x 4 post to the base...