Step 12: Bottom Railings Assembly
•
The first step is to drill 32mm holes in line with the centre of the top and bottom of the
railings for the 120mm screws on the four corner upright posts. Secure the top and bottom
of the rails with 120mm screws just like the other railings and use decking screws to secure
the bottom timber of the railings to the decking floor.
•
Securing the rails to the 1275mm
post will be the most difficult and the screws will need to
be angled for this connection.
Summary of Contents for Las Vegas Commercial Climbing Frame
Page 1: ...Las Vegas Commercial Climbing Frame Instruction Manual...
Page 3: ...3 Rock Wall with baton 1 4 1617mm post 3 5 3m post 2...
Page 4: ...6 1435mm post 2 7 2420mm post with a piece of 3 x 1 5 secured to it 2 8 1275mm post 2...
Page 6: ...14 120mm screws 34 15 Sides for playhouse 2 16 Front for playhouse 1...
Page 21: ......
Page 24: ......
Page 27: ......
Page 31: ......
Page 33: ......
Page 35: ......
Page 37: ......
Page 42: ...Step 24 Use decking screws to secure the 4 x 4 post to the base...