background image

 

 

Section 2: Installation 

 

08/2015 

14 

Rev. 5       50699

 

 

 

 

 

 

 
 

 

Base Assembly, Continued 

 

5.   Insert a cotter  pin  (

#17

) through the 

Axle Rod. 

 

•  Using needle nose pliers, bend 

back both haves of the cotter pin 
to secure the wheel assembly. 

 

6.   Repeat steps two through four (2-4) 

for the second axle. 

 

7.   Center the axles in the base, and then 

insert the four locking screws  (

#15

into each of the tapped holes in the 
bottom of the base. 

 

•  Located directly under the axle 

holes 

 

8.   Tighten the locking screws, and then 

secure the Lock  Nuts  (

#14

). 

 

9.   Turn the platform over so it sets on 

the wheels. 

 

 
 
 
 
 
 
 
 
 

After inserting the four Cotter Pins, center the 

axles, tighten the Locking Screws, and then 

secure the Lock Nuts. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for BPP1000 Series

Page 1: ...ustin Ft Worth NicolScales com 800 225 8181 Contact Us Nicol Scales Measurement is an ISO Accredited Calibration Company that has provided calibration repair and sales of all types of weighing and mea...

Page 2: ...50699 Revision 5 08 2015 1990 2015 by Fairbanks Scales Inc All rights reserved Portable Platform Scale BPP1000 Series BPP2000 Series Installation Manual...

Page 3: ...rovements are made Fairbanks Scale Inc shall not be liable for any loss damage cost of repairs incidental or consequential damages of any kind whether or not based on express or implied warranty contr...

Page 4: ...Kansas City MO 64106 Created 08 1990 Revision 1 8 1990 Released Manual Revision 2 11 2006 Updates made to include BPP2000 Revisions in text formatting illustration updates Descriptions and processes...

Page 5: ......

Page 6: ...ponsibilities 9 Repair Restrictions 9 Service Responsibility 9 Operating Requirements 9 Description 10 Specifications 10 SECTION 2 INSTALLATION 11 Unpacking 11 Tools Required for Assembly 11 Base Asse...

Page 7: ...08 2015 8 Rev 5 50699...

Page 8: ...o this equipment Customer Operator Responsibilities It is the customer operator s responsibility to maintain and protect the scale from accidental or malicious damage Repair Restrictions The Portable...

Page 9: ...external power connections and will operate in a wide variety of environmental conditions Specifications Specifications BPP 1000 BP 2000 Capacity 1000 lbs 2000 lbs Division Size 1 2 lb 1 lb Platform C...

Page 10: ...Section 1 General Information 08 2015 11 Rev 5 50699...

Page 11: ...eck that all parts are included using the packing list Check for component damage that may have occurred during shipping The scale platform under structure arrives fully assembled with the levers in t...

Page 12: ...Platform Sub Assembly on the floor upside down preferably on 2x4 blocks to raise it up off the floor if possible 2 Remove the cotter pins and washers from one side of the Axle Rod 19 Axle assembly inc...

Page 13: ...through four 2 4 for the second axle 7 Center the axles in the base and then insert the four locking screws 15 into each of the tapped holes in the bottom of the base Located directly under the axle h...

Page 14: ...with the pillar cut outs facing the right and left of the platform 3 Insert the Steelyard Rod 35 down through the pillar The bent hook on top the loose Swivel Hook on the bottom The hook opening shoul...

Page 15: ...ert the Beam Lock 43 onto the front end of the Beam Assembly See image to the right Hook the bottom Load Loop to the Steelyard Rod Pulling the Beam up hook the top Fulcrum Loop 11 Slide the Beam Lock...

Page 16: ...tion if moved to any position then released 1 Unlock the Beam Lock Loop to allow the beam to balance The beam should move up and down freely coming to rest in the center of the trig lock opening 2 Bal...

Page 17: ...y a slight pressure to the scale platform and see if the beam tip rises If it does continue onto balancing step If it does not recheck mechanical assembly If the scale beam still does not balance beam...

Page 18: ...n Corner Loop 11 71623 Loop Corner 12 71624 Bearing Corner Loop 13 71625 Cotter Pin 11 12 13 58938 Corner Loop Assembly 14 95867 Nut Hex 15 95868 Bolt Hex Head 16 95869 Wheel 5 Diameter 17 71628 Cotte...

Page 19: ...Beam Assembly 100 x 0 5 lb 55017 BPP1000 1K x 0 5 NON NTEP Beam 71633 BPP2000 2000 lb Portable Beam 75711 BPP2000 BPP2000 Beam Insert 50 71632 Pivot 51 Pivot 51 52 53 95842 Poise Assembly 53 Loop 54 5...

Page 20: ...08 2015 21 Rev 5 50699 Parts Diagram 46 45 43 44 39 40 52 49 55 56 54 57 1 3 2 61 62 33 6 25 31 5 26 10 35 8 7 11 12 9 13 14 15 17 24 18 34 16 19 4...

Page 21: ...08 2015 22 Rev 5 50699...

Page 22: ...Document 50699 Manufactured by Fairbanks Scales Inc 821 Locust Street Kansas City MO 64106 www fairbanks com PortablePlatformScale ModelsBPP1000 BPP2000...

Reviews: