73
4
CHECKLIST
4.1
LE-700 Installation Work Check List
After the instrument is installed, record the results. Check the boxes for the checked items.
Fill in the blanks ( ) with parameter values.
□
Is the installation place proper?
□
Are the connections of Pump 1 and Pump 2 proper?
□
Do cleaning water and cooling water properly flow?
□
Is the processing size proper?
Master size adjustment
Size at installation ( ) After adjustment ( )
Complete if size adjustment or any other items has been made.
□
Is the axis angle proper?
AXIS adjustment Axis at installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.
□
Is the lens polished properly?
Polish differential (
CR-39 / Bevel
) At installation ( ) After adjustment ( )
Polish differential (
CR-39 / Flat
) At installation ( ) After adjustment ( )
Polish size (
CR-39 / Bevel
) At installation ( ) After adjustment ( )
Polish Size (
CR-39 / Flat
) At installation ( ) After adjustment ( )
Polish axis (
CR-39 / Flat
) At installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.
□
Is the bevel position proper?
Bevel position adjustment for auto mode At installation ( ) After adjustment ( )
Bevel position (Polish) At installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.
□
Is the lens grooved properly?
Groove position adjustment for auto mode At installation ( ) After adjustment ( )
Groove depth At installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.